Tuesday, September 16, 2008

Exterior Work

This week the guys have been busy working on soffits and putting up the planking on the porch ceiling. They also started the board and batten siding on the gable ends. The beautiful redwood shingles have been delivered for the big dormer and they add a wonderful scent to the house! They have started pressure washing the logs to prepare them for stain. The basement stairs have been delivered and they are building retaining walls around the basement windows. Many activities are going on in an attempt to get the house finished enough on the outside to have the stain applied. Other work soon to happen is exterior grading and application of the foundation stone. Art is hoping to have the outside finished up by Thanksgiving.

David and I went out for a great after-season shoreline exploration boat trip. We drove around the entire perimeter of the lake, stopping at Uno's for an early dinner. After visiting with our neighbor to view their spectacular new house, it was quite late when we returned to the dock. Too dark for pictures but I'll be back this weekend to help out with the Savageman Triathlon and hopefully I will get some photos to update the blog with.

Monday, September 8, 2008

Framing, Fireplaces and Windows

The game room downstairs with all of the bedroom framing completed



Windows installed on lake side




Great room with hearth framing, fireplace and chimneys


New windows from the inside




The mighty Mastercraft on a windy day



Finally, a week of big progress! All of the framing was completed in the basement, 8 windows and 2 doors were installed, and both fireplaces and some shower units are in place. Now that it is after Labor Day, we have made it through the summer without a house. Soon we will be pulling the boat and dock for the year. Hopefully construction continues to go smoothly and next summer will find us enjoying our new completed home!